Useful Documents

These documents can be easily downloaded by simply clicking on the one you would like.

In some instances Parcel Property may procure a Structerre Site Classification and Structerre BAL report. Please contact us if you wish to check at info@parcelproperty.com.au

Stage Plans

Stage 3 Plan

Individual Lot Plans/Angle Plans

Stage 3 Angle Plan / Deposited Plan

Other Information

Title Updates

Please see below the title and survey update. Please note that not all of these stages are open to the public and some are still classed as construction sites.

Before visiting the site to conduct surveys, please call the relevant contact to ensure there are no issues with any specific lot.

All personnel MUST notify the site supervisor before entering the site and be equipped with the appropriate PPE.

Project Beenyup Grove
Stage2
DP Number413445
Expected Title DateJune 14, 2018
Available for SurveyAvailable
Notes TITLED – access open
ProjectBeenyup Grove
Stage1
DP Number413101
Expected Title DateDecember 6, 2017
Available for SurveyAvailableYes
Notes TITLED – access open

The following steps outline the instructions to complete a Design Application.

  • Step 1 – Specify what Lot you are submitting plans for
  • Step 2 – Upload Plans (site plan and elevations)
  • Step 3 – Nominate your point of contact
  • Step 4 – Comments
  • Step 5 – Submit Application

A representative will endeavour to provide an approval within 5 working days. If you need to make changes or withdraw your application or have any queries, please email: approvals@parcelproperty.com.au

  • Lot & Owner Details

  • Point of Contact

  • Uploads

  • Drop files here or
    Accepted file types: jpg, png, pdf.
    • Drop files here or
      Accepted file types: jpg, png, pdf.